Executive Summary

This document presents updated design and specifications for the ModernMT prototypes and final product, that will be developed during the final 18 months of the project.

Starting from the addressed use cases, we outline the overall requirements of the ModernMT product, and then explain how these have to reflect in the design and specifications of the architecture and the main components developed in the project.

Download the PDF

1430235416_pdf-128D1.2 – Second Design and Specifications Report (PDF, 519 KB)